Quick and easy handling

The complete CENO-TUBE-system can be erected by just four people. In a disaster relief scenario, when every minute counts, a safe flood protection barrier can be installed at a rate of approximately 40 – 150 m/h (depending on module size) – without need for heavy equipment, with no construction works needed, and no superfluous material transportation.

This makes the CENO-TUBE up to 92 times faster than comparable sandbag solutions.

The tubes of the CENO-TUBE are rolled out with a winch wheel.

 

The hoses are connected to the pump and filled with water.  

 

The sealing membrane is spread on the water-filled tubes.

The dike is constructed and the water is dammed.